Client: Panattoni
Category: Industrial
Project Status: Completed
Key Features
- Demolition of existing cold store and energy centre
- Enhanced facade to the building
- Staged build process
Overview
The project comprises of three units across 175,000 sq ft. Two of the units were spec builds and the other was designed to suit an incoming tenant.
Unit 1 was pre-let to UKPN who relocated from an existing building being leased on site. The warehouse is circa 20,000 sq ft with an 8m haunch height, 3 level access doors, and a 17,000 sq ft main office over 2 storeys. Following UKPN moving into their new building in September 2020, their existing building was demolished to allow further redevelopment of the site.
Units 3 and 4 were a speculative development. They are made up of a 139,000 sq ft warehouse split across the two units, with a 15m haunch height, 10no. dock doors and circa 15,000 sq ft main offices. A demountable wall was constructed between the two units so that they had the flexibility to be let as either one or two units.
Our Role: | Employer's Agent |
Location: | Borehamwood |
Size: | 175,000 sq ft |
General Enquiries
Want to talk to us about a project?
.(JavaScript must be enabled to view this email address)