Key Features
- BREEAM Very Good
- Flexibility to alter the demises of the terraced units as tenants require
- Incorporating late tenant changes to Unit 1 during the base build phase
- Specialist attenuation tank design so they can be utilised as sprinkler tanks
- EVCP and car share spaces installed as standard
Overview
Demolition and remediation of a brownfield site. Construction of three separate buildings, with units 2 and 3 being split into seven terraced units.
Each base build unit was constructed on a speculative basis, with each individual office fitted to CAT B standard. The scheme also involved S278 works to create a new access road and three new bellmouths into the site. The first unit was pre-let prior to practical completion.
Our Role: | Project Manager, Cost Manager & Employer's Agent |
Location: | Leighton Buzzard |
Size: | 50,000 sq ft (Unit 1) | 65,200 sq ft (Unit 2) |